Hemerdon permit consultation tests controls for mobile plant

The Environment Agency plans a further consultation on draft conditions if it proposes to approve the variation.

· 515 words

1Summary

The Environment Agency’s consultation on Drakelands Restoration Limited’s application to vary the Hemerdon Mineral Processing Facility environmental permit closes at 11.59 pm on 11 December 2026. The application is made under the applicable environmental permitting regulations. Drakelands, owned by Tungsten West plc, seeks to bring its mobile plant within the permit and extend the installation boundary. The agency will decide whether to grant or refuse the variation and, if granted, what conditions to attach.

2Options consulted on

  • Permanently include the mobile front end, comprising crushing and screening operations, in the permitted mineral processing facility.
  • Extend the installation boundary to include the mobile front end.

3Analysis

The agency’s consultation notice says it will first assess the application and reach a draft decision. If it proposes to grant the variation, it says it will consult again on the draft variation and decision document. That differs from its news release, which describes the present exercise as consultation on the draft permit. The first response can address the application and seek particular controls; the later exercise would allow scrutiny of the conditions the agency proposes.

Under the applicable regulations, the agency must consider representations made through the applicable consultation procedure before determining the application. It must grant or refuse a duly made application and may attach conditions, with variations linked to the change applied for. The agency says it must grant an application that meets all legal requirements. That does not settle which conditions are needed to meet them: evidence about the plant’s effects and the adequacy of controls remains relevant to that decision.

The agency’s local enforcement position is not a permit. Its public account says the position imposed processing-rate and operating-hour restrictions and required an application for longer-term operation. The agency subsequently said it had allowed crushing, screening and in-line pressure jig operations while it assessed noise impacts. It says it can withdraw the position for a breach or unacceptable impacts. Drakelands benefits from the temporary arrangement; nearby residents and workers bear the risk of inadequately controlled emissions, although that does not establish that harm has occurred.

The current application portal includes the enforcement-position letter, existing permit, proposed boundary plans, noise assessment and dust management plan. A consultation draft for the existing permit included conditions on uncontrolled emissions and noise and vibration, each with an appropriate-measures qualification. Those are not confirmed conditions for the proposed mobile-plant variation. Responses can ask whether operating hours, processing rates, monitoring and management-plan requirements should be carried into the variation, and identify evidence supporting the requested controls.

Comments can be submitted through the agency’s Smart Citizen Engagement consultation portal, by email to pscpublicresponse@environment-agency.gov.uk, or by post to Environment Agency Permitting and Support Centre, Land Team, Quadrant 2, 99 Parkway Avenue, Sheffield, S9 4WF. The agency normally places comments and respondents’ names on the public register; respondents can ask for their response not to be public. Paper copies can be requested on 03708 506 506, with copying charges possible.

4Key dates

  • 07 July 2026: The Environment Agency says it issued the local enforcement position.
  • 11 December 2026: Comments must be received by 11.59 pm.